Port of Los Angeles Waterfront Project

The Project

At a Galance

full story
  • Client

    LA Port Department

  • Project Status

    2020 - Current

  • Sector

    Infrastructure

Project Scopes/Services

Subsurface Imaging, Special Inspection, Environmental Compliance, materials Testing, QC/QA Inspection

Project Summary

The proposed Project includes a continuous eight-mile-long and up to thirty-foot-wide promenade extending throughout the entire proposed Project area primarily at the water’s edge. The promenade would generally include a boardwalk, railing, lighting, pedestrian signage, landscaping, and seating. The waterfront promenade would connect the entire waterfront area and provide venues for special events, signage and information regarding waterfront and downtown San Pedro attractions, and a pedestrian-oriented transportation network