Herzog
2019 - Current
Alternative Project Delivery (APD)
Rail
Environmental Compliance, Quality Management, Materials Testing, QC/QA Inspection, Geotechnical Engineering
The Brightline Phase 2 Expansion includes a mix of track upgrades and new construction including 19 new bridges along a 168-mile rail corridor and will allow maximum allowable speeds of 110 mph between West Palm Beach and Cocoa, and 125 mph between Cocoa and Orlando. Construction is divided up into four zones. the north-south segment (Zone 4) from Cocoa to West Palm Beach and will build 129 miles of ballasted track within the existing Florida East Coast Railroad (FECR) right-of-way. Also perform trackwork on the Zone 3 segment as a subcontractor. This 35-mile stretch of ballasted double track will be constructed in a new, grade-separated right-of-way, from Cocoa to the new OIA Intermodal Terminal.
Our vision is to build a world where diversity is ingrained in the foundation of the future. Always looking forward - we invest in the future we want for our company, our clients, our environment, and the communities we serve. We stay ahead of trends to position ourselves at the leading edge of a constantly changing industry. Our success doesn't come from one person or one department—it comes from all of us working together toward a shared vision: a better world for everyone involved in our business.
To apply for a job with The Quality Firm, please send a cover letter together with your resume.